oracle|Oracle DBA创建数据库试题精选
【shitiku.jxxyjl.com--Oracle认证】
Q. 1 : This symbol, When you put infront of a line in the parameter file,1. $
2. @
3. #
4. !
3
Q. 2 : When you change a parameter value in the parameter file, when will
1. Immediately after saving the parameter file
2. At the first CHECKPOINT after saving the paramter file
3. When the DBWR finishes writing all the dirty buffers to the disk
4. At the next instance startup
4
Q. 3 : ALTER SYSTEM DEFFERED command modifies the global parameters for
1. existing sessions after a certain amount of time
2. new sessions only
3. existing and new sessions
4. depends on the SPIN_COUNT initialization parameter
2
Q. 4 : The location where debugging trace files for back ground processes are
1. LOGFILE_DEST
2. ORACLE_HOME
3. BACKGROUND_DUMP_DEST
4. CORE_DUMP_DEST
3
Q. 5 : In case of heavy contention for latches, set the LOG_SIMU
1. Twice the number of CPUs
2. Same as the DB Block Buffers
3. Same as the Shared Pool Size
4. None of the above
4
Q. 6 : What is the first step in manually creating a new database
1. Startup an instance
2. Start SQL*Plus and connect to Oracle as SYSDBA
3. Check the instance identifier for your system
4. Create a parameter file
4
Q. 7 : Which of the following is true regarding control files
1. Oracle recommeds atleast two control files stored on two separate disks
2. Oracle recommeds atleast two control files stored on one disk
3. Oracle recommeds to store one control file
4. One control file is not enough to run a database
Q. 8 : Tom created a database with a DB_BLOCK_SIZE of 2k, he wants to
1. Issue ALTER SYSTEM SET DB_BLOCK_SIZE=4k command
2. recreate the database with the new setting
3. It can be done in both the ways
4. the DB_BLOCK_SIZE cannot be 4k
2
Q. 9 : Howmany rollback segments are required for Oracle to startup apart
1. Oracle can start with just the system rollback segment
2. Oracle Needs atleast 3 rollback segments before it can start
3. Oracle Needs a Temp Rollback Segment before it can start
4. None of the above
1
Q. 10 : The unit of measurement for DB_BLOCK_SIZE intialization parameter is
1. BLOCKS
2. BYTE
3. PAGE
4. ROW
2
Q. 11 : This tablespace is a must before you run the database instance
1. ROLLBACK
2. TOOLS
3. TEMP
4. SYSTEM
4
Q. 12 : Which initialization parameter determines the rollback segments that
1. ROLLBACKS
2. LOGFILE GROUP
3. ROLLBACK_SEGMENTS
4. DBA_ROLLBACK_SEGS
3
Q. 13 : Which of the following is a valid but undocumented parameter in Oracle
1. _CORRUPT_RBS
2. _CORRUPT_REDO
3. _CORRUPT_ROLLBACK_SEGMENTS
4. None of the above
-
oracle|Oracle DBA 存储管理试题选详细阅读
注:答案在选项后面 Q 1 : Oracle immediately re-uses the space assigned to row-directory portion of the data block once you delete the corresponding row...
-
官方消息是什么意思_官方消息:Oracle 8i认证即将退休详细阅读
2004年5月1日,OracleProfessional即将退休,所心课程。公司正式通知,Oracle 8i Data有的DBA OCP考生必须在2004年1base Administrator Certified 2月31日完成所有的Oracle 8i 核...
- 详细阅读
-
oracle_Oracle DBA 逻辑备份试题选详细阅读
注: 答案在选项后面 Q 1 : What option of Exporting allows quicker data extractions 1 Grants =y 2 Consistent =y 3 Direct = true 4 Direct=y 4 : Dir...
-
[oracle数据库专家认证]Oracle认证的专家之见详细阅读
如今在IT行业,认证是你想成为Oracle DBA,有了文中,我们就来分析一下OC个很时髦的词儿。很多老板都对证书就证明你胜任这份工作吗?P认证。人名后面的头衔感兴趣,但是如果或者说它只是你的一张入门证。本认证的价值...
-
全网最大软件合集_全洲最大软件ORACLE公司中国软件人才培训详细阅读
近日,全球最大的企业软件公司ORACLE(甲骨文)公司宣布与中国国际人才交流基金会联合推出软件人才培训计划。 此次合作将重点拓展ORACLE职业能力发展计划(Oracle Workforce Development Program),结合中国国际人才交流基金会在政策、资金层面的实力,培...
-
[oracle数据安全控制机制包括]Oracle数据安全面面观(2)详细阅读
(二)来自内部的另外一个隐患--用户管理以及密码问题 在这里,其实作为一个差不多点的数据库管理员都很清楚,Oracle数据库本身就使用了很多种手段来加强数据库的安全性,经常见到的就有密码,角色,权限等等。那么我们就从最简单的DBSNMP说起: Oralce数据库如果采用典型安装后,自动...
-
[oracle公司]Oracle公司 Oracle9i DBA OCP认证新规定详细阅读
Oracle9i DBA OCP认证新规定Oracle9i DBA的考生需参加至少一门Oracle大学的培训,才可在通过考试后,获取专业资格认证证书。 这将是Oracle公司对OCP培训的一次正名。特别是对于目前社会上没有Oracle授权的培训中心来说,无疑是一个不好的消息。...
-
oracle数据安全控制机制包括_Oracle数据安全面面观(1)详细阅读
随着计算机的普及以及网络的发展,数据库已经不再仅仅是那些程序员所专有的话题。而Oracle数据库更是凭借其性能卓越,操作方便灵活的特点,在数据库的市场中已经占据了一席之地。但是同样随着网络技术的不断进步,数据信息的不断增加,数据安全已经不再是以前的“老生长谈”,也更不是以前书本上那些“可望不可...
-
【oracle dba认证】ORACLE认证2002完全版详细阅读
今天,技术已经成为企业发展的关键所在。对于希望在充满竞争的国际市场上谋求一席之地的企业来说,一个技术先进,性能良好的系统能够带来史无前例的经济效益。但是,随着产品周期的日益缩短,新的信息技术已经进入到一个高速发展的阶段,IT专业人员发现跟上技术发展的脚步越来越难。由此而产生的结果是,IT...